ZATCA Wave ReadinessLast reviewed: November 1, 20267 min read

ZATCA Wave 25: Eligibility, Timeline Verification & ERP Readiness Guide

As ZATCA expands Phase 2 (Integration Phase) across progressively lower annual VAT-taxable revenue brackets—including Wave 25 and subsequent rollout groups—Saudi businesses must prepare their ERP, POS, and billing systems well ahead of their assigned integration window.

Important Compliance Distinction: Do not confuse a ZATCA wave announcement date or notification date with your company’s final integration deadline. Each wave specifies a revenue threshold and an integration window; businesses must verify their exact obligation date directly via official ZATCA notifications and the FATOORA portal.

1. How ZATCA Phase 2 Integration Waves Work

ZATCA implements the Phase 2 Integration Phase in sequential waves determined by the taxpayer’s annual taxable revenue subject to VAT in historical reference years (such as 2021, 2022, 2023, or 2024).

For each wave, ZATCA announces the revenue threshold at least six months prior to the mandatory integration window. Taxpayers falling within the announced revenue threshold receive official notifications from ZATCA instructing them to complete FATOORA onboarding within their assigned start and end dates.

2. Notification Date vs. Actual Integration Deadline

A common mistake among finance and IT teams is treating the date of ZATCA’s public announcement—or the date an email notice arrives—as the final cutover date, or conversely waiting until the final week of the integration window to begin technical work.

Because ZATCA provides a Sandbox and Simulation environment on the FATOORA portal, businesses should use the preparation period to audit customer master data, configure ERP tax codes, test UBL 2.1 XML generation, and complete Compliance CSID checks before switching to Production CSIDs.

  • Step 1 — Verify Your Status: Log in to the ZATCA portal and check official correspondence for your VAT Registration Number (TRN).
  • Step 2 — Audit All EGS Units: Identify every ERP module, branch billing system, and POS system that issues tax invoices or credit/debit notes.
  • Step 3 — Cleanse Customer Master Data: Ensure B2B customer records contain valid 15-digit VAT numbers and full Saudi National Address fields.
  • Step 4 — Complete Simulation Testing Early: Run compliance checks in ZATCA Simulation before activating Production CSIDs.

3. Technical Readiness Checklist for Wave 25 Taxpayers

For mid-market and growing Saudi enterprises included in Wave 25 and adjacent waves, ERP readiness typically stalls on master data completeness and credit/debit note linkage rather than network connectivity.

ERP Preparation Checklist Prior to ZATCA Phase 2 Go-Live
Checklist DomainRequired Action in ERP / POSZATCA Rule Reference
Seller & Branch IdentityVerify 15-digit VAT number, CRN, and National Address for every branchBR-KSA-08 / BR-KSA-09
B2B Buyer Master DataEnforce buyer 15-digit VAT number (for VAT-registered buyers) and full structured addressBR-KSA-81 / BR-10
Credit & Debit NotesEnforce original invoice reference number and issuance reason on all adjustmentsBR-KSA-56 / BR-KSA-17
VAT Exemption ReasonsMap zero-rated (Z), exempt (E), and out-of-scope (O) tax codes to official ZATCA reason codesBR-KSA-DEC-01

Official ZATCA Regulatory References

Frequently Asked Questions

Check your annual VAT-taxable revenue against ZATCA’s official Rollout Phases page on zatca.gov.sa and review official notifications sent to your registered ZATCA portal account and email.
KSA Enterprise Integration Assessment

Request a ZATCA Phase 2 Technical Demo

Share your existing ERP environment and monthly invoice volume. Our integration engineers will walk you through the middleware architecture, UBL 2.1 XML transformation, and CSID onboarding flow.